• @NOT_RICK@lemmy.world
    link
    fedilink
    English
    183 months ago

    I was bullish on nuclear for a while but having looked at how expensive it is to build out I don’t think it really makes much sense anymore

    • @Fosheze@lemmy.world
      link
      fedilink
      English
      313 months ago

      It really depends on the location and situation. With the new generations of reactors they can also do things like seawater desalination with the waste heat alongside power production. You also have situations where the nuclear waste heat is used to heat entire communities far more efficiently than could be done with electricity. There are also many places where solar and wind just aren’t practical for various reasons. In those areas nuclear may be a good option for base load power. Nuclear is also still far less environmentally destructive than hydro.

      Yes, nuclear power plants are henoiusly expensive and there are definitely areas that they shouldn’t be built, but they do still serve a purpose in certain areas. Most of the flack nuclear gets is just because most of our reactor fleet was built durring the cold war. New technologies can acheive far more with nuclear power far more safely and cost effectively than those old reactors.

        • @Fosheze@lemmy.world
          link
          fedilink
          English
          13 months ago

          Even then I don’t imagine it would be easy. Anything in a nuclear plant needs to be built to an extremely exacting standard that I’m pretty sure old coal powerplant components wouldn’t be. I can’t see how you could convert a coal plant into a nuclear plant without having to completely rebuild everything.

          • @Duamerthrax@lemmy.world
            link
            fedilink
            23 months ago

            The problem with reusing coal turbines isn’t that they couldn’t work, but that you would have to engineer everything backwards from the turbines to the reactor. You COULD do that, but really, you should be engineering to what the current projections for the power needs to be, not the projected power needs from when the coal plant was built.

            Maybe reusing the coal plant site makes sense, but only if the coal plant was already taken offline, which to be fair, a lot of plants are being taken offline.

      • BarqsHasBite
        link
        fedilink
        23 months ago

        From the little I know it’s a pipe dream. Just completely different scales.

    • Pennomi
      link
      fedilink
      English
      83 months ago

      Most of the cost is regulatory, and for good reason. I’d like to think that the new small modular reactors will allow us to reduce cost but it’ll take a lot longer than we have available to us.

    • @Mnemnosyne@sh.itjust.works
      link
      fedilink
      English
      13 months ago

      Two things could remove much of the expense and increase safety:

      1- remove lawsuits and NIMBYism to overcome. That’s where a lot of the cost and delay comes from when building these, so if millions didn’t have to be spent on lawsuits just to get the goahead to begin construction it’d cut the cost massively.

      2- remove profit from the equation. Without profit motive, the incentives that encourage discarding safety in favor of profit go way down.